fbpx
+232 76 258 258 info@vsltravel.com

Endeavour signs for 202MW hydro

Endeavor Energy has inked an agreement with Joule Africa to jointly develop and build the 202MW Bumbuna Phase 2 hydroelectric scheme in Sierra Leone.

The $700m project will add to the existing 50MW at Bumbuna Phase 1 (pictured), which was completed and commissioned in 2009.

https://renews.biz/54340/endeavour-signs-for-202mw-hydro/